Open post

Phase 1 ESA Macon, Georgia

Mill Creek Environmental (MCE) successfully completed another Phase I Environmental Site Assessment (ESA) for a large restaurant group in Macon, Georgia. The phase Environmental Site Assessment was requested by our client who required the report prior to a potential purchasing agreement. The phase one ESA report was completed in a quicker than normal turnaround time...

Open post Georgia Asbestos Testing Project

Georgia Asbestos

Mill Creek Environmental was commissioned to conduct a general inspection for potential asbestos containing materials (ACMs) within a local public storage facility. After conducting a limited survey of the existing building, collecting numerous samples of suspect material and submitting for lab analysis. Samples were examined using a Polarized Light Microscope (PLM) testing method. Upon results,...

Speak to an Environmental Expert