Mill Creek Environmental (MCE) has completed this Phase I Environmental Site Assessment (ESA) outside Washington, D.C. The Phase I ESA was completed on a parcel just shy of 2 acres. The subject property is currently occupied by a vacant furniture showroom and warehouse facility. Improvements to the subject property include a 25,000 square foot warehouse/showroom...
Project Category: Phase I ESA
Virginia Phase I ESA
Mill Creek Environmental (MCE) has completed a Phase I Environmental Site Assessment (ESA) of the property located in Richmond, VA. The Phase I ESA includes subject property composed of two (2) adjoining parcels with an 8,000-square foot cinderblock building that includes a two-story office space and a warehouse and ground cover surrounding the building and...
Texas Phase I ESA
Mill Creek Environmental (MCE) has completed a Phase I Environmental Site Assessment (ESA) of the local restaurant located outside Dallas, Texas. The property consists of over 2-acres and includes one 8,000-square foot frame building with stone walls, asphalt parking lot, and minor landscaped areas along the perimeter. The subject property is currently occupied by a...
Tennessee Phase 1 and Phase II ESA
We recently completed a Phase 1 Environmental Assessment at a former paving company construction yard and found that due to improper handling and storage of petroleum products and hazardous materials, it needed a Phase 2 Environmental Assessment. We completed Phase 1 and 2 together and found regulated compounds in groundwater below the property. Based on...
Phase 1 ESA Macon, Georgia
Mill Creek Environmental (MCE) successfully completed another Phase I Environmental Site Assessment (ESA) for a large restaurant group in Macon, Georgia. The phase Environmental Site Assessment was requested by our client who required the report prior to a potential purchasing agreement. The phase one ESA report was completed in a quicker than normal turnaround time...
Pennsylvania Phase I ESA
Mill Creek Environmental (MCE) has completed a Phase I Environmental Site Assessment (ESA) of the property outside Philadelphia, Pennsylvania. The Property is a 1-acre parcel with three (3) structures, a metal-sided building used as an automotive maintenance shop, a concrete-block drive-thru car wash, and a steel-framed open-sided tent covering an auto-detailing area, that collectively total...
Ohio Phase I ESA
The local Board of Commissioners has authorized Mill Creek Environmental to prepare a report for the Ohio Environmental Protection Agency (EPA) Voluntary Action Program (VAP) and a Phase I Property Assessment (Phase I) Work Plan. The Phase I Work Plan is for the local downtown business district. The goal of a Phase I Property Assessment...
North Carolina Environmental Site Assessment
Mill Creek Environmental has completed a Phase I Environmental Site Assessment (ESA) of a local mobile home park property located in North Carolina. The Phase I ESA was performed in accordance with the American Society for Testing and Materials (ASTM) Standard Practice E1527-13. The mobile home park consists of approximately 23 acres with 95 rentable...
Missouri Phase I ESA
Mill Creek Environmental (MCE) has completed a Phase I Environmental Site Assessment (ESA) of the property located south of Springfield, Missouri. The subject property is composed of a 3.0-acre parcel of land and has multiple two-story buildings used as a hotel with a total area of approximately 85,000-square feet and approximately 175 guestrooms. Additional amenities include...
Mississippi Phase I
At the request of an investment company, Mill Creek Environmental (MCE) has completed a Phase I Environmental Site Assessment (ESA) for local apartment complex. The Phase I ESA was performed in accordance with the American Society for Testing and Materials (ASTM) Standard Practice E1527-13. The complex consists of twenty (20) multi-family residential structures with a total...
Illinois Phase I ESA
Mill Creek Environmental (MCE) has completed a Phase I Environmental Site Assessment (ESA) of the property located in Illinois. This property has been improved with a community drinking water collection, treatment, and distribution system for a subdivision that includes two water supply wells, a small modular storage unit, two small concrete block buildings, and two...
Alabama Phase 1 Finds UST
Mill Creek Environmental (MCE) has performed a Phase I Environmental Site Assessment on 2-acres of undeveloped land in Colbert County, Alabama. After the due diligence investigation, this assessment has identified an underground storage tank (UST) system located on the subject property. According to the Alabama Department of Environmental Management (ADEM) UST Program, no petroleum releases...